Springs Hill Water Treatment Plant Expansion

Springs Hill Water Treatment Plant Expansion

Client: Springs Hill Water Supply Corporation
Date Initiated: October 2009
Date Completed: October 2011

This project was made possible by the American Reinvestment Act of 2009. M&S Engineering provided all required engineering services to double the capacity of the existing water treatment plant to 2 million gallons per day (MGD) capacity for the Springs Hill Water Treatment Plant. To reach efficiency goals Variable Frequency Drives and Solar Panels were incorporated and tied into the existing SCADA system. M&S also provided electrical engineering, hydraulic analysis, structural designs, surveying, and construction management with in-house resources.