Springs Hill Water Treatment Plant Expansion

Client: Springs Hill Water Supply Corporation
Date Initiated: October 2009
Date Completed: October 2011

This project was made possible by the American Reinvestment Act of 2009. M&S Engineering provided all required engineering services to double the capacity of the existing water treatment plant to 2 million gallons per day (MGD) capacity for the Springs Hill Water Treatment Plant. To reach efficiency goals Variable Frequency Drives and Solar Panels were incorporated and tied into the existing SCADA system. M&S also provided electrical engineering, hydraulic analysis, structural designs, surveying, and construction management with in-house resources.

LP_WTP-5 LP_WTP-9 LP_WTP-22

M.E.P. Projects

This is the start of a successful relationship
Contact us or call 830-228-5446

Relationships are our Cornerstone

Join our E-Newsletter

Be informed about everything going on in our industry. Sign up and stay up to date with all that is going on around the company.

Follow Us

MAIN OFFICE

SPRING BRANCH
6477 FM 311,
SPRING BRANCH, TX 78070

BRANCH OFFICE

HOUSTON
2204 TIMBERLOCH, STE. 228,
THE WOODLANDS, TX 77380

BRANCH OFFICE

NEW BRAUNFELS
376 LANDA STREET,
NEW BRAUNFELS, TX 78130

BRANCH OFFICE

GEORGETOWN
102 W. MORROW, STE. 101,
GEORGETOWN, TX 78626

BRANCH OFFICE

SAN ANTONIO
12719 SPECTRUM DR., STE. 100,
SAN ANTONIO, TX 78249