The Bluebonnet Electric Cooperative requested services from M&S Engineering for the conversion of approximately 2.5 miles of 1/0 aluminum overhead single phase line to a 1/0 ACSR three phase line in Bastrop County. M&S performed field staking of the line to meet Bluebonnet’s specifications and transferred this to electronic staking sheets in Bluebonnet’s Partner software system. The design of this line included use of expanding foam to provide intermediate backfill for structural support on all un-guyed three phase poles. Verification of condition and integrity of utility poles located in the first two spans of all single phase primary taps in the project area was performed as well. Two programmable sectionalizers were added and all foreign attachments clearances were verified or corrected as needed.

This is the start of a successful relationship
Contact us or call 830-228-5446

Relationships are our Cornerstone

Join our E-Newsletter

Be informed about everything going on in our industry. Sign up and stay up to date with all that is going on around the company.

Follow Us

MAIN OFFICE

SPRING BRANCH
6477 FM 311,
SPRING BRANCH, TX 78070

BRANCH OFFICE

HOUSTON
2204 TIMBERLOCH, STE. 228,
THE WOODLANDS, TX 77380

BRANCH OFFICE

NEW BRAUNFELS
376 LANDA STREET,
NEW BRAUNFELS, TX 78130

BRANCH OFFICE

GEORGETOWN
102 W. MORROW, STE. 101,
GEORGETOWN, TX 78626

BRANCH OFFICE

SAN ANTONIO
12719 SPECTRUM DR., STE. 100,
SAN ANTONIO, TX 78249