Wurstfest Electrical Upgrades

Date Initiated: 2014
Date Completed: 2015

M&S Engineering’s scope was to assess and upgrade the obsolete and undersized electrical facilities at the Wurstfest grounds in New Braunfels. This included site inspections and analysis of the dated electrical facilities. The MEP design team was tasked with electrical load analysis, identification of key areas of safety concern, code compliances, and overseeing the construction of electrical drawings for the upgrade electrical facilities. Installed and constructed under a three phase approach, the new electrical system utilizes new consolidated 208V three phase electrical feeds to serve a sectionalized system for Wursthalle and Marktplatz with sufficient capacity for future expansions. To date, phases 1 and 2 have been competed with phase 3 scheduled for next year.

M.E.P. Projects

This is the start of a successful relationship
Contact us or call 830-228-5446

Relationships are our Cornerstone

Join our E-Newsletter

Be informed about everything going on in our industry. Sign up and stay up to date with all that is going on around the company.

Follow Us

MAIN OFFICE

SPRING BRANCH
6477 FM 311,
SPRING BRANCH, TX 78070

BRANCH OFFICE

HOUSTON
2204 TIMBERLOCH, STE. 228,
THE WOODLANDS, TX 77380

BRANCH OFFICE

NEW BRAUNFELS
376 LANDA STREET,
NEW BRAUNFELS, TX 78130

BRANCH OFFICE

GEORGETOWN
102 W. MORROW, STE. 101,
GEORGETOWN, TX 78626

BRANCH OFFICE

SAN ANTONIO
12719 SPECTRUM DR., STE. 100,
SAN ANTONIO, TX 78249