OSI Medical Complex

The project scope included three buildings, totaling 21,742SF. M&S provided mechanical, electrical, and plumbing system design for the medical complex.
The mechanical design team performed the HVAC load calculations, selected HVAC equipment, and designed the ductwork while coordinating with the Architect to ensure structural and space requirements were met. The electrical design team provided site plans for lighting and power as well as lighting layout and electrical floor plans.

The team coordinated fixture selection with the Owner and performed a code compliance check prior to submission of the construction drawings. The building’s proposed electrical load was analyzed to prepare panel schedules and riser diagrams. The plumbing design team provided floor plans for plumbing, sanitary drainage, as well as supply and distribution drawings.

This is the start of a Successful Relationship

Testimonials

5
3
M&S Engineering

Focused on Developing Relationships

This partnership we have forged will launch our District well into the future. With a supportive Board we have focused on developing relationships that bond us with our consultants as partners rather than tools that we use. We feel that we have a very symbiotic relationship with our team at M&S.

Mike Taylor
Crystal Clear Special Utility District - General Manager

M&S Engineering
5
2020-06-12T13:22:11-05:00

Mike Taylor
Crystal Clear Special Utility District - General Manager

This partnership we have forged will launch our District well into the future. With a supportive Board we have focused on developing relationships that bond us with our consultants as partners rather than tools that we use. We feel that we have a very symbiotic relationship with our team at M&S.