M&S Engineering’s scope was to assess and upgrade the obsolete and undersized electrical facilities at the Wurstfest grounds in New Braunfels. This included site inspections and analysis of the dated electrical facilities. The MEP design team was tasked with electrical load analysis, identification of key areas of safety concern, code compliances, and overseeing the construction of electrical drawings for the upgrade electrical facilities. Installed and constructed under a three phase approach, the new electrical system utilizes new consolidated 208V three phase electrical feeds to serve a sectionalized system for Wursthalle and Marktplatz with sufficient capacity for future expansions. To date, phases 1 and 2 have been competed with phase 3 scheduled for next year.

This is the start of a successful relationship